Thursday, August 21, 2008

Joe Wheeler Electric


Well the people from Joe Wheeler Electric finally came out to look at the land and start working on getting power to the house site. We met from 7:30 till 9:00 this morning, and I think that we have all the possible routes for our power covered so that he can work on an estimate for us.

We have two main options for getting power to the house. The first is running a line over the road and this option involves getting a special permit from the State and that usually takes at least 1 month. The second option is pulling the line from the house that is right across from us. The engineer said that he will go by and talk with them about it, so hopefully they will give us premission to do this.

Please say a little prayer for us that the second option is the one that we get to end up going with because it will be much easier and we will not have to cut down a lot of trees.

1 comment:

Jamie said...

I am way behind on blog reading.

Hope all the electricity issues work out.